Improving Wireless programme news
Progress reports
Following completion of the pilot the Improving Wireless programme will deploy the Juniper Mist modern, enterprise wireless platform as part of the existing Managed Wireless Service (MWS) into departmental and faculty buildings in a five year rollout from June 2025. The programme has adopted the agile delivery approach with four weekly sprints of work. The information below details what has been delivered in each sprint.
EIGHT STAGE PROCESS |
BUILDING: DIVISION |
1. Collect Wi-Fi, building, tenant information |
|
2. Consult on Wi-Fi requirements |
|
3. Create Wi-Fi simulation and design for the building |
|
4. Assess and define installation and cabling work |
|
5. Review asbestos status |
|
6. Ensure listed buildings requirements are met |
|
7. Install Wi-Fi into building |
TOTAL NUMBER OF WI-FI ACCESS POINTS INSTALLED: 958
|
8. Validate with post install RF Survey |
|
BLOCKED BUILDINGS |
|
EIGHT STAGE PROCESS |
BUILDING: DIVISION |
1. Collect Wi-Fi, building, tenant information |
|
2. Consult on Wi-Fi requirements |
|
3. Create Wi-Fi simulation and design for the building |
|
4. Assess and define installation and cabling work |
|
5. Review asbestos status |
|
6. Ensure listed buildings requirements are met |
|
7. Install Wi-Fi into building |
TOTAL NUMBER OF WI-FI ACCESS POINTS INSTALLED: 19
|
8. Validate with post install RF Survey |
|
BLOCKED BUILDINGS |
|
EIGHT STAGE PROCESS |
BUILDING: DIVISION |
1. Collect Wi-Fi, building, tenant information |
|
2. Consult on Wi-Fi requirements |
|
3. Create Wi-Fi simulation and design for the building |
|
4. Assess and define installation and cabling work |
|
5. Review asbestos status |
|
6. Ensure listed buildings requirements are met |
|
7. Install Wi-Fi into building |
TOTAL NUMBER OF WI-FI ACCESS POINTS INSTALLED: 30
|
8. Validate with post install RF Survey |
|
BLOCKED BUILDINGS |
|
EIGHT STAGE PROCESS |
BUILDING: DIVISION |
1. Collect Wi-Fi, building, tenant information |
|
2. Consult on Wi-Fi requirements |
|
3. Create Wi-Fi simulation and design for the building |
|
4. Assess and define installation and cabling work |
|
5. Review asbestos status |
|
6. Ensure listed buildings requirements are met |
|
7. Install Wi-Fi into building |
TOTAL NUMBER OF WI-FI ACCESS POINTS INSTALLED: 63
|
8. Validate with post install RF Survey |
|
BLOCKED BUILDINGS |
|